- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Clarification - Onboard Administrator enclosure li...
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-18-2010 08:47 AM
08-18-2010 08:47 AM
Clarification - Onboard Administrator enclosure link cabling
Angel had a customer question regarding the linking of the Onboard Administrator modules:
**************************************
Hello all,
I’ve been asked to clarify what is the best practice of linking the OAs of multiple enclosures. One
suggestion was that a loop needed to be created between the enclosure down link port of the last
enclosure to the enclosure link-up port and service port of the first enclosure.
The HP BladeSystem c7000 Enclosure Setup and Installation Guide has two notes which appear
to contradict each other regarding the top enclosure link-up port.
NOTE: The enclosure link ports are designed only to support c-Class enclosures in the same rack.
The enclosure link-up port on the top enclosure is the service port, and the enclosure link-down port
on the bottom linked enclosure is unused. [Sic implies no bottom to top connection]
NOTE: If more c-Class enclosures are added to the rack at a later time, the open enclosure link-up
port on the top enclosure can be used to link the new enclosure.
What is the correct way to link multiple enclosures/OAs? If a loop is created, what are the
ramifications? Thanks in advance.
*************************************************
Monty was on top of it:
*********************************************
The enclosure link ports are used by the OA to determine topology – the enclosure at the top of the stack is the top enclosure in the GUI view of linked enclosures.
Yes – an additional use of the enclosure up link port is as a service port – to connect to a PC Ethernet port.
Do NOT loop the top enclosure to the bottom enclosure – this loops the OA enclosure link network and there is no end to the topology chain.
**********************************************
Comments? Other suggestions? Good to go?