- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Re: Powering (UK) 3 x C7000 Enclosures - Help Ne...
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-17-2016 03:10 PM
01-17-2016 03:10 PM
Powering (UK) 3 x C7000 Enclosures - Help Needed
Hello,
I have 3 x HP C7000 enclosures. One has 14 x BL460c in there , the other has 3 x BL465c in there and the third one has 1 x BL860c in it. I will be placing all three in a HP 10000 G2 Rack, as well as a router, firewall and X1400 G2 Network Storage etc.. I beleive they are all Generation 6 blades.
What I would like to know how do i power these things. I'll be using these in England, Am i right in thinking that I need two Power Distribution Units and then use 16A power jumper cables to connect to each C7000, applying three of the six power sockets to one PDU and the remaining three to the other PDU... And then get an electrician in to connect the PDU inputs to some sort of some sort of power box, because surely a UK mains socket cant handle all of this power.
Any advise on how to power this rack would be welcome- Thanks!
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-18-2016 05:25 PM
01-18-2016 05:25 PM
Re: Powering (UK) 3 x C7000 Enclosures - Help Needed
A fully loaded C7000 chassis could draw between 12,000 and 15,000 watts. This is not a residential or office load, it is a commercial data center load using dedicated branch wiring.This also means a very significant heat load. I would suggest that you consult with a data center specialist who can properly size all the circuits, the UPS and air conditioning.
Specs that you need are:
Quickspecs: http://www8.hp.com/h20195/v2/GetPDF.aspx/c04128339.pdf
Installation: http://www.hp.com/ctg/Manual/c00698286.pdf
Bill Hassell, sysadmin