(REFERENCE)Server Performance Report report type is missing

by on ‎03-07-2012 01:29 PM


At the PPM8.00_InstallationAdmin.pdf document on page 258 there is a guide on how to create a Server Performance Report. It says that there should be (REFERENCE)Server Performance Report report type available with the PPM system installed.


We do not have this report type. Any ideas why? Are we missing something (like Best Practices)?


This is a known issue documented in Release notes of SP1 on page-69.You may download the same from the SSO site or the link below:

I am also pasting the same here for your ready reference:

PROBLEM The (REFERENCE)Portlet Performance Report report type listed in the Report
Type Workbench should be listed as (REFERENCE)Server Performance Report.

WORKAROUND To use the (REFERENCE)Portlet Performance Report report type to generate
performance reports on activity in the standard interface or on portlet activity, follow
the instructions described in the Installation and Administration Guide for using the
(REFERENCE)Server Performance Report report type.

Best regards,