- Community Home
- >
- Storage
- >
- Midrange and Enterprise Storage
- >
- HPE EVA Storage
- >
- Re: MS2012FC Installation with Multiple Path to du...
HPE EVA Storage
1752590
Members
4001
Online
108788
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-25-2009 10:06 PM
03-25-2009 10:06 PM
MS2012FC Installation with Multiple Path to dual DL380G5 problem?
I have installed 1 x MSA 2012FC storage with 12 x 300GB HDD, the MSA has dual controller (IP = 10.0.0.2 ad 10.0.0.3). With is connected to 2 x DL380G5 servers, each installed with 1 x dual-port Q-logic card. Totally 4 host fibre ports (WWN) exists in the system.
The syystem is used for MSCS.
Now I change the Q-logic config. as loop connection and BIOS enable. The fibre connection is direct connection without SAN switch.
In the SMH, I config. 3 x logical drives, each consists of 4 x 300GB HDD as RAID 1+0, so totally 3 logical drives.
I know I need to map these 3 vdisks to those 4 WWN. I map all 3 logical drives full access to all 4 WWN. But for each item from logical disk to WWN, it shows the LUN option for me to fill. Should I assign the same LUN for all WWN to 1 logical drives (3 Luns) or assign individual LUN for each WWN to each logical drives (12LUNs)?
The syystem is used for MSCS.
Now I change the Q-logic config. as loop connection and BIOS enable. The fibre connection is direct connection without SAN switch.
In the SMH, I config. 3 x logical drives, each consists of 4 x 300GB HDD as RAID 1+0, so totally 3 logical drives.
I know I need to map these 3 vdisks to those 4 WWN. I map all 3 logical drives full access to all 4 WWN. But for each item from logical disk to WWN, it shows the LUN option for me to fill. Should I assign the same LUN for all WWN to 1 logical drives (3 Luns) or assign individual LUN for each WWN to each logical drives (12LUNs)?
1 REPLY 1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
03-26-2009 03:25 AM
03-26-2009 03:25 AM
Re: MS2012FC Installation with Multiple Path to dual DL380G5 problem?
Microsoft Cluster server?
If so first I would install mpio on both servers present the luns to just one servers wwns. Format the drives assigning drive letters and labels. then shutdown that server. present luns to second servers wwns, scan for the disks and assign the same drive letters to the luns, no need to reformat. once done shutdown your second server. power on the first server and install cluster services, once completed power on second server and add to the cluster.
If so first I would install mpio on both servers present the luns to just one servers wwns. Format the drives assigning drive letters and labels. then shutdown that server. present luns to second servers wwns, scan for the disks and assign the same drive letters to the luns, no need to reformat. once done shutdown your second server. power on the first server and install cluster services, once completed power on second server and add to the cluster.