<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Multi-Enclosure Stacking Flex10/10-D question in BladeSystem - General</title>
    <link>https://community.hpe.com/t5/bladesystem-general/multi-enclosure-stacking-flex10-10-d-question/m-p/6719476#M30444</link>
    <description>&lt;P&gt;&lt;STRONG&gt;Jean-Yves had a MES question:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Hello All&lt;/P&gt;
&lt;P&gt;Just a confirmation and hope an explaination is possible, from Installation guide&lt;/P&gt;
&lt;P&gt;We need to have same type of interconnect in MES configuration so&lt;/P&gt;
&lt;P&gt;Customer can’t create an MES configuration with Mix up of 10/10-d ? (Flex10 in first enclosure and remaining enclosure populated with 10-d)&lt;/P&gt;
&lt;P&gt;Is it still true ? why this restriction since customer can’t order anymore flex10 to build a desired MES configuration&lt;/P&gt;
&lt;P&gt;Thanks in advance&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;**********&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;STRONG&gt;Reply from Fred:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;*************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;This restriction is due to port and stacking link differences between the Flex-10 and Flex 10/10D modules.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;You can have the customer upgrade the old enclosure to Flex 10/10D. You might investigate outside sources for Flex 10 modules. Or you could configure the new modules in a separate VC domain and direct-connect the old and new domains. If you go with the direct-connect configuration, verify that the failover mode is manual and not auto. That way you can control which path is active on both sides and which is standby.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;**************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;STRONG&gt;Comments?&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Thu, 12 Mar 2015 17:58:59 GMT</pubDate>
    <dc:creator>chuckk281</dc:creator>
    <dc:date>2015-03-12T17:58:59Z</dc:date>
    <item>
      <title>Multi-Enclosure Stacking Flex10/10-D question</title>
      <link>https://community.hpe.com/t5/bladesystem-general/multi-enclosure-stacking-flex10-10-d-question/m-p/6719476#M30444</link>
      <description>&lt;P&gt;&lt;STRONG&gt;Jean-Yves had a MES question:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Hello All&lt;/P&gt;
&lt;P&gt;Just a confirmation and hope an explaination is possible, from Installation guide&lt;/P&gt;
&lt;P&gt;We need to have same type of interconnect in MES configuration so&lt;/P&gt;
&lt;P&gt;Customer can’t create an MES configuration with Mix up of 10/10-d ? (Flex10 in first enclosure and remaining enclosure populated with 10-d)&lt;/P&gt;
&lt;P&gt;Is it still true ? why this restriction since customer can’t order anymore flex10 to build a desired MES configuration&lt;/P&gt;
&lt;P&gt;Thanks in advance&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;**********&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;STRONG&gt;Reply from Fred:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;*************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;This restriction is due to port and stacking link differences between the Flex-10 and Flex 10/10D modules.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;You can have the customer upgrade the old enclosure to Flex 10/10D. You might investigate outside sources for Flex 10 modules. Or you could configure the new modules in a separate VC domain and direct-connect the old and new domains. If you go with the direct-connect configuration, verify that the failover mode is manual and not auto. That way you can control which path is active on both sides and which is standby.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;**************&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;STRONG&gt;Comments?&lt;/STRONG&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Thu, 12 Mar 2015 17:58:59 GMT</pubDate>
      <guid>https://community.hpe.com/t5/bladesystem-general/multi-enclosure-stacking-flex10-10-d-question/m-p/6719476#M30444</guid>
      <dc:creator>chuckk281</dc:creator>
      <dc:date>2015-03-12T17:58:59Z</dc:date>
    </item>
  </channel>
</rss>

