<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: power down procedure for C7000 in BladeSystem - General</title>
    <link>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338991#M4877</link>
    <description>No other way than pulling the plug =)</description>
    <pubDate>Fri, 16 Jan 2009 07:46:42 GMT</pubDate>
    <dc:creator>JKytsi</dc:creator>
    <dc:date>2009-01-16T07:46:42Z</dc:date>
    <item>
      <title>power down procedure for C7000</title>
      <link>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338990#M4876</link>
      <description>I checked into the C7000. I don't see any power switches, therefore if I do need to power down the C7000, should I just unplug the power cords?&lt;BR /&gt;&lt;BR /&gt;In addition, the "device power sequence" shown on the OA, is it ONLY used for determining the powerup sequence, and my blades do not have any dependency, I can just leave them disabled and will the blades be automatically come up after the C7000 has been up?&lt;BR /&gt;&lt;BR /&gt;thanks</description>
      <pubDate>Fri, 16 Jan 2009 07:36:36 GMT</pubDate>
      <guid>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338990#M4876</guid>
      <dc:creator>Anna Cheng</dc:creator>
      <dc:date>2009-01-16T07:36:36Z</dc:date>
    </item>
    <item>
      <title>Re: power down procedure for C7000</title>
      <link>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338991#M4877</link>
      <description>No other way than pulling the plug =)</description>
      <pubDate>Fri, 16 Jan 2009 07:46:42 GMT</pubDate>
      <guid>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338991#M4877</guid>
      <dc:creator>JKytsi</dc:creator>
      <dc:date>2009-01-16T07:46:42Z</dc:date>
    </item>
    <item>
      <title>Re: power down procedure for C7000</title>
      <link>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338992#M4878</link>
      <description>thanks.&lt;BR /&gt;Easy answer :-).&lt;BR /&gt;&lt;BR /&gt;But does any know whether I need to "enable" the device power sequence? I know I can use that to order to power up sequence, but if I just want everything to come up, do I need to do anything?&lt;BR /&gt;&lt;BR /&gt;</description>
      <pubDate>Sat, 17 Jan 2009 08:45:09 GMT</pubDate>
      <guid>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338992#M4878</guid>
      <dc:creator>Anna Cheng</dc:creator>
      <dc:date>2009-01-17T08:45:09Z</dc:date>
    </item>
    <item>
      <title>Re: power down procedure for C7000</title>
      <link>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338993#M4879</link>
      <description>nope =)</description>
      <pubDate>Sat, 17 Jan 2009 12:49:42 GMT</pubDate>
      <guid>https://community.hpe.com/t5/bladesystem-general/power-down-procedure-for-c7000/m-p/4338993#M4879</guid>
      <dc:creator>JKytsi</dc:creator>
      <dc:date>2009-01-17T12:49:42Z</dc:date>
    </item>
  </channel>
</rss>

