<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Power down / Power up procedure in HPE Nimble Storage Solution Specialists</title>
    <link>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166684#M553</link>
    <description>&lt;P&gt;Hello,&lt;/P&gt;&lt;P&gt;We have a Nimble CS1000 head shelf with a&amp;nbsp;&lt;SPAN&gt;ES2-H210T disk shelf hooked up.&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;&lt;SPAN&gt;We will be moving all hardware to a new location. Can anyone tell us what the procedure is to gracefully shut them down and power off, and powering them on and start it up after the move ?&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;Hope to hear from someone soon, thanks !&lt;/P&gt;</description>
    <pubDate>Fri, 27 May 2022 02:07:23 GMT</pubDate>
    <dc:creator>Joeri86NL</dc:creator>
    <dc:date>2022-05-27T02:07:23Z</dc:date>
    <item>
      <title>Power down / Power up procedure</title>
      <link>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166684#M553</link>
      <description>&lt;P&gt;Hello,&lt;/P&gt;&lt;P&gt;We have a Nimble CS1000 head shelf with a&amp;nbsp;&lt;SPAN&gt;ES2-H210T disk shelf hooked up.&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;&lt;SPAN&gt;We will be moving all hardware to a new location. Can anyone tell us what the procedure is to gracefully shut them down and power off, and powering them on and start it up after the move ?&lt;/SPAN&gt;&lt;/P&gt;&lt;P&gt;Hope to hear from someone soon, thanks !&lt;/P&gt;</description>
      <pubDate>Fri, 27 May 2022 02:07:23 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166684#M553</guid>
      <dc:creator>Joeri86NL</dc:creator>
      <dc:date>2022-05-27T02:07:23Z</dc:date>
    </item>
    <item>
      <title>Re: Power down / Power up procedure</title>
      <link>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166834#M554</link>
      <description>&lt;P&gt;Hi Joeri86NL&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;Power down&lt;/STRONG&gt;:&lt;BR /&gt;To avoid possible data loss, it is important that active data connections to the array be gracefully terminated before the array is powered down.&lt;BR /&gt;An array powered off remotely will require an on-site, manual press of the power button to resume operation.&lt;/P&gt;&lt;P&gt;Log into the Array via the WebUI then navigate to the following path (This will shut down all of the arrays):&lt;BR /&gt;Administration -&amp;gt; Shutdown -&amp;gt; &amp;lt;group name&amp;gt;&lt;BR /&gt;Log into the Array via the WebUI then navigate to the following path (This will shutdown an individual array in the group):&lt;BR /&gt;Administration -&amp;gt; Shutdown -&amp;gt; &amp;lt;array name&amp;gt;&lt;/P&gt;&lt;P&gt;Halt the specified array. Restarting the array will require physically powering it back on.&lt;BR /&gt;Halting an array will stop the Nimble OS processes and the power of the head shelf.&lt;BR /&gt;Halting an array will not power off any expansion shelves; those must be powered off using the power button on the unit.&lt;/P&gt;&lt;P&gt;&lt;BR /&gt;&lt;STRONG&gt;Power up procedure&lt;/STRONG&gt;:&lt;BR /&gt;We currently do not have a way to remotely power on an array, or expansion shelf.&lt;BR /&gt;The array will need to be powered on manually, with the power button.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Hope this helps.!!&lt;/P&gt;&lt;P&gt;Regards&lt;BR /&gt;Mahesh.&lt;/P&gt;</description>
      <pubDate>Mon, 23 May 2022 08:16:28 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166834#M554</guid>
      <dc:creator>Mahesh202</dc:creator>
      <dc:date>2022-05-23T08:16:28Z</dc:date>
    </item>
    <item>
      <title>Re: Power down / Power up procedure</title>
      <link>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166838#M555</link>
      <description>&lt;P&gt;Hi&amp;nbsp;&lt;a href="https://community.hpe.com/t5/user/viewprofilepage/user-id/1931905"&gt;@Mahesh202&lt;/a&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Thank you very much !&lt;/P&gt;
&lt;P&gt;One more question. When we want to power on the devices on site, is this the correct order ?&lt;/P&gt;
&lt;P&gt;- put Headunit and diskshelf in rack&lt;BR /&gt;- connect all cabling as before&lt;BR /&gt;- poweron &lt;SPAN&gt;ES2-H210T DISK shelf&lt;/SPAN&gt;&lt;BR /&gt;- then poweron &lt;SPAN&gt;CS1000 head shelf&lt;/SPAN&gt;&lt;/P&gt;
&lt;P&gt;Thanks again !&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 24 May 2022 07:46:51 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166838#M555</guid>
      <dc:creator>Joeri86NL</dc:creator>
      <dc:date>2022-05-24T07:46:51Z</dc:date>
    </item>
    <item>
      <title>Re: Power down / Power up procedure</title>
      <link>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166944#M556</link>
      <description>&lt;P style="margin: 0;"&gt;Hello Joe,&amp;nbsp;&lt;BR /&gt;Yes, that's right approach. You can go ahead and perform the same for powering up the machine.&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 24 May 2022 09:14:53 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-nimble-storage-solution/power-down-power-up-procedure/m-p/7166944#M556</guid>
      <dc:creator>Vipin_S</dc:creator>
      <dc:date>2022-05-24T09:14:53Z</dc:date>
    </item>
  </channel>
</rss>

