<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Request for Guidance on SAN Switch Migration in HPE Storage Networking - Switches</title>
    <link>https://community.hpe.com/t5/hpe-storage-networking-switches/request-for-guidance-on-san-switch-migration/m-p/7223797#M535</link>
    <description>&lt;P&gt;Dear All,&lt;/P&gt;&lt;P&gt;I am planning the migration of a SAN switch to a new model in our environment, which includes a C7000 enclosure with blades and a 3PAR 8300. I would appreciate your suggestions on the pre-checks and validations that need to be performed before initiating the migration. Additionally, please advise on the potential risks associated with this process.&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;Details of the Migration:&lt;/STRONG&gt;&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;&lt;STRONG&gt;Current SAN Switch Model:&lt;/STRONG&gt; HPE 8/8 BASE (0) E-PORT ENABLED SAN SWITCH (AM866C)&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;New SAN Switch Model:&lt;/STRONG&gt; HPE SN3600B 32GB 24/8 8-PORT 32GB SHORT WAVE SFP28 FIBRE CHANNEL SWITCH (R7R97A)&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;VMware ESXi Version:&lt;/STRONG&gt; 8.0&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;Server Models:&lt;/STRONG&gt; BL460 Gen 9 &amp;amp; Gen 10&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Furthermore, I would appreciate any recommendations for the best action plan to ensure a smooth and successful migration.&lt;/P&gt;&lt;P&gt;Thank you for your support.&lt;/P&gt;</description>
    <pubDate>Tue, 27 Aug 2024 04:34:07 GMT</pubDate>
    <dc:creator>Zayaan</dc:creator>
    <dc:date>2024-08-27T04:34:07Z</dc:date>
    <item>
      <title>Request for Guidance on SAN Switch Migration</title>
      <link>https://community.hpe.com/t5/hpe-storage-networking-switches/request-for-guidance-on-san-switch-migration/m-p/7223797#M535</link>
      <description>&lt;P&gt;Dear All,&lt;/P&gt;&lt;P&gt;I am planning the migration of a SAN switch to a new model in our environment, which includes a C7000 enclosure with blades and a 3PAR 8300. I would appreciate your suggestions on the pre-checks and validations that need to be performed before initiating the migration. Additionally, please advise on the potential risks associated with this process.&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;Details of the Migration:&lt;/STRONG&gt;&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;&lt;STRONG&gt;Current SAN Switch Model:&lt;/STRONG&gt; HPE 8/8 BASE (0) E-PORT ENABLED SAN SWITCH (AM866C)&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;New SAN Switch Model:&lt;/STRONG&gt; HPE SN3600B 32GB 24/8 8-PORT 32GB SHORT WAVE SFP28 FIBRE CHANNEL SWITCH (R7R97A)&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;VMware ESXi Version:&lt;/STRONG&gt; 8.0&lt;/LI&gt;&lt;LI&gt;&lt;STRONG&gt;Server Models:&lt;/STRONG&gt; BL460 Gen 9 &amp;amp; Gen 10&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Furthermore, I would appreciate any recommendations for the best action plan to ensure a smooth and successful migration.&lt;/P&gt;&lt;P&gt;Thank you for your support.&lt;/P&gt;</description>
      <pubDate>Tue, 27 Aug 2024 04:34:07 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-storage-networking-switches/request-for-guidance-on-san-switch-migration/m-p/7223797#M535</guid>
      <dc:creator>Zayaan</dc:creator>
      <dc:date>2024-08-27T04:34:07Z</dc:date>
    </item>
    <item>
      <title>Re: Request for Guidance on SAN Switch Migration</title>
      <link>https://community.hpe.com/t5/hpe-storage-networking-switches/request-for-guidance-on-san-switch-migration/m-p/7223856#M538</link>
      <description>&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;you can not Mix the 8GB and 32GB SAN Switch, they are inoperable.&lt;/P&gt;&lt;P&gt;So you have to remove the 8GB and replace it with 32GB.&lt;/P&gt;&lt;P&gt;This is the same as if the 8GB failed.&lt;/P&gt;&lt;P&gt;Check for redundant Path to the Hosts&lt;BR /&gt;Copy out your Switch configuration and Zoning and configure the new one as same.&lt;BR /&gt;Replace one with the new&lt;BR /&gt;Check for redundant Path to the Hosts&lt;BR /&gt;Proceed with the second&lt;/P&gt;&lt;P&gt;This is the Way, I do.&lt;/P&gt;&lt;P&gt;Cali&lt;/P&gt;</description>
      <pubDate>Tue, 27 Aug 2024 14:36:55 GMT</pubDate>
      <guid>https://community.hpe.com/t5/hpe-storage-networking-switches/request-for-guidance-on-san-switch-migration/m-p/7223856#M538</guid>
      <dc:creator>Cali</dc:creator>
      <dc:date>2024-08-27T14:36:55Z</dc:date>
    </item>
  </channel>
</rss>

