- Community Home
- >
- Storage
- >
- HPE Nimble Storage
- >
- Array Setup and Networking
- >
- Re: Does forcing a controller failover cause any l...
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-18-2017 07:45 AM
08-18-2017 07:45 AM
Hi,
I have inherited a VMware system with a 4-node blade connected to a Nimble CS-215, I am now in the process of retiring the blade setup and replacing it with two rack mounted servers. The problem I have is that when the system was originally setup they did not put any switches between the Nimble and the blade interconnect bays so i have a problem connecting the new servers to the storage.
What I want to be able to do is re-route the connections from the non-active controller through the two new storage switches and then force a controller failover and then do the same with the now non-active controller, I do not have any experience with Nimble controllers and I want to be sure that forcing the failover will not cause any loss of connectivity to the current VM hosts.
Solved! Go to Solution.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-21-2017 02:30 AM
08-21-2017 02:30 AM
SolutionHello Simon,
As long as your external switch has the same subnets for Management & iSCSI with correct VLANs configured, as well as other networking specifics such as flow control, jumbo frames (if applicable) plus others such as spanning tree - then you should be ok.
A controller failover will forcibly migrate the IP addresses of all array IPs from one controller to the other. This will also cause a re-ARP on the network, so you're looking at anywhere between 3-15 seconds worth of network "outage" whilst this occurs.
You will want to check your servers to ensure the correct Nimble Toolkits are installed for Windows, Linux and VMware to ensure that any applicable registry settings are applied, which will allow you to withstand this IP and re-ARP process.
If in doubt, give your local Nimble SE a call - and check in with Nimble Support to check your settings before you carry out this work.