BladeSystem Design Question

 
Sj Kim
Occasional Visitor

BladeSystem Design Question

Eight BL460's with one Emulex HBA in C7000 enclosure running Windows 2003 Server R2 need to boot off EMC CLARiiON CX700 (with two Brocade switches) using two Ethernet and FC VCM's. How should it be configured to maximize redundancy?
2 REPLIES
MichelNL
Advisor

Re: BladeSystem Design Question

bay 1 & 2 > lan
bay 3 & 4 > san
bay 5 & 6 > lan

hba on mezz 1.

This is how we got it overhere.
JKytsi
Honored Contributor

Re: BladeSystem Design Question

Attach the Clariion with max number of fibers to SAN switches. Then You have more paths to storage from servers.
Remember to give Kudos to answers! (click the KUDOS star)