Bladesystem C7000 - Brocade 4GB hot swap backplane slot?

 
masterstyle
Occasional Visitor

Bladesystem C7000 - Brocade 4GB hot swap backplane slot?

Hi, I must change the c7000 backplane slot for our fiber switches brocade 4GB: actually we have 1+1 redundance into the slots 3 and 4 and we would like to move into 5 and 6, if possible to do, 1 switch at time (of course!) without powerdown the server connected to SAN by HBA?

thanks!
2 REPLIES
Trygve Henriksen
Respected Contributor

Re: Bladesystem C7000 - Brocade 4GB hot swap backplane slot?

Eh...

If you move the switches to other slots, you probably also have to move the mezzanine cards in the servers...

Unless you have mezzanine cards with more ports...
masterstyle
Occasional Visitor

Re: Bladesystem C7000 - Brocade 4GB hot swap backplane slot?

hi,
yes I Known that, we`ll power off all bladeserver - extract it from enclosure and change internal mezzanine slot.