BladeSystem - General
1752809 Members
6009 Online
108789 Solutions
New Discussion юеВ

Re: Hp 7000 Dual 10gb Bl-c switches

 
amsnet
New Member

Hp 7000 Dual 10gb Bl-c switches

Unable to get second blade switch in slot 7/8 to link up to Cisco switch. Switch in blade 5/6 works fine. Swapped switches between slots, replaced mid-plane assembly and both switches. Issue seems to be with slot 7/8. Configuration between both switches is identical.
3 REPLIES 3
Sheanshar
Advisor

Re: Hp 7000 Dual 10gb Bl-c switches

What's the server is install in the slot 7/8 of the 7000 enclosure?
Do you have the ethernet mezzanine in the blade ?
amsnet
New Member

Re: Hp 7000 Dual 10gb Bl-c switches

Yup mezz cards are installed in each blade. We have 3 BL490's and 2 BL460's. In the back in slot 7/8 we have the 10gb bl-c switches.
Dan Robinson_4
Regular Advisor

Re: Hp 7000 Dual 10gb Bl-c switches

I could be wrong but I dont think 10GB Mezz cards map to 7 and 8, only port 3 and 4 of a Quad Port 1GB Card.

For your Half Height Blades
Onboard = IC 1/2
Mezz 1 = IC 3/4
Mezz 2 Dual Port = IC 5/6
Mezz 2 Quad port = IC 5/6/7/8

Your 10GB Cards, assuming Mezz 2 are mapped to 5/6 so having the Interonnects in 7 and 8 will not work.