How to best do 3-phase load balancing for c7000 power circuits.

 

Dick provides this advice:

 

A key consideration when using a 3-Phase PDU (3-Phase Input; 1-Phase Outputs via PDU’s Load Segments) with c7000 Enclosures is ‘balancing the load across the three phases/Load Segments for balanced PDU Input power.

 

The c7000 Site Prep Guide covers this quite well on page 43:

Does this provide the info you need? Let us know!