Impact of changing Flex-10 module IP Addresses for new Subnet

 
patronblue
Occasional Contributor

Impact of changing Flex-10 module IP Addresses for new Subnet

I have two fully-populated C7000 enclosures connected in a fully redundant stacking link configuration.  Our network team has decided to move our device management network so I need to re-IP all four OAs (v3.60) and VCs (v3.70).  I have been told that 'production' network traffic will be impacted when we change the Virtual Connect module (Flex-10) IP addresses.  If so, about how long an outage will we experience?  Is there a recommended order in which we should update the VC modules?

 

Thanks, Dave