Virtual Connect Manager Status Critical Error and Stacking Link Error

 
masesanemh
Frequent Visitor

Virtual Connect Manager Status Critical Error and Stacking Link Error

Hi

 

I have C7000 enclosures running in my environment with Interconnect in BAY 1-2(HP VC Flex-10 Enet ver 3.75) to BAY 3-4(HP VC 8Gb 24-Port FC ver 1.04), Populated with a mix of BL460c G6, BL870 c, BL680G7, BL680 G6 etc. Error "One or more of a domain's subsystems are not properly operating, causing serious impact to domain functions" and "Some VC-Enet modules are not properly connected via stacking Links”.

Please verify stacking cable connection." SFP's in Port X7 and X8 are not plugged in, i need a solution to this errors and it shows server profiles degraded as well.

 

Thank you so much..