HPE Community read-only access December 15, 2018
This is a maintenance upgrade. You will be able to read articles and posts, but not post or reply.
Hours:
Dec 15, 4:00 am to 10:00 am UTC
Dec 14, 10:00 pm CST to Dec 15, 4:00 am CST
Dec 14, 8:00 pm PST to Dec 15, 2:00 am PST
Comware Based
cancel
Showing results for 
Search instead for 
Did you mean: 

4800G IRF Stacking

 
slittle
Occasional Contributor

4800G IRF Stacking

The configuration guide advises that only four switches can be IRF stacked. We have a requirment for a network upgrade that will require a number of stacks with 7, 5, 3 and 2 switches in each stack.



 



Can someone confirm if this is still correct as statement below is from



 





"You are recommended to connect at most four Switch 4800G series switches to form an IRF"





 



 



Page 1941 on 4800G Family configuration guide.