Comware Based
cancel
Showing results for 
Search instead for 
Did you mean: 

IRF Node Replacement

Deep17
Occasional Contributor

IRF Node Replacement

Hi Friends,

 

I am new to HP Switches,

 

We have two HP5500-24G EI switches stacked using IRF..

 

just has quary while replacing faulty node,

 

we have to do IRF configuration same as we did on faulty switch and then need to add in IRF ?

 

is configuration related to that node will erase ?

 

Thanks,

 

Deep17

2 REPLIES
Fredrik Lönnman
Honored Contributor

Re: IRF Node Replacement

I would probably boot up the new switch, install the same image as the IRF stack, configure it with the switch ID its supposed to have in the stack, power off, connect to the stack and power on. It will receive the config from the stack master after stack merge.

---
CCIE Service Provider
MASE Network Infrastructure [2011]
H3CSE
CCNP R&S

Deep17
Occasional Contributor

Re: IRF Node Replacement