HPE Community read-only access December 15, 2018
This is a maintenance upgrade. You will be able to read articles and posts, but not post or reply.
Hours:
Dec 15, 4:00 am to 10:00 am UTC
Dec 14, 10:00 pm CST to Dec 15, 4:00 am CST
Dec 14, 8:00 pm PST to Dec 15, 2:00 am PST
cancel
Showing results for 
Search instead for 
Did you mean: 

Need reeebot

 
anacia
Occasional Contributor

Need reeebot

I must to put a second cable Stacking XRN betwen Switch 5500 G-EI, my question is



Must I shutdown both Switchs before for put the cable?



After put the cable must I reebot the switch?



1 REPLY
Fred_Mancen_1
Super Advisor

Re: Need reeebot

You can connect the new cable without hesitation. The new switch must have exactly the same file system (same .app, .web and .btm versions) and the same sysname. Only the new switch will reboot, the units that are in production does not reboot during the synchronization process. Take a look on the stackable switches advanced configuration guide:



http://support.3com.com/documents/switches/3Com_Stackable_Switch_Advanced_Config_Guide.pdf



HTH