- Community Home
- >
- Storage
- >
- Entry Storage Systems
- >
- Disk Enclosures
- >
- EVA4100 to 6100 migration plan
Disk Enclosures
1753481
Members
4775
Online
108794
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-11-2010 07:13 AM
02-11-2010 07:13 AM
EVA4100 to 6100 migration plan
Hi Folks,
We are planning our migration from EVA4100-2C4D to EVA6100-2C6D with the following material:
- Loop switch pair
- Command View Upgrade for 6100
- 2 new drive enclosures + disks
And here is our general plan:
0. Backup data
1. Shutdown hosts and EVA4100
2. Disconnect loop cables from existing enclosures, keep EAB connections
3. Connect controller device ports to loop switches
4. Connect existing enclosures to loop switches
5. Power on EVA6100 and management server
6. Check/rescan Command View, install new license
7. Power on servers
8. Add new enclosures and disks one by one (on-line)
Our downtime window is pretty reduced, about 1 hour.
Please, may you share with us any insight about this?
Any help will be vastly appreciated,
Thanks,
Albatross
We are planning our migration from EVA4100-2C4D to EVA6100-2C6D with the following material:
- Loop switch pair
- Command View Upgrade for 6100
- 2 new drive enclosures + disks
And here is our general plan:
0. Backup data
1. Shutdown hosts and EVA4100
2. Disconnect loop cables from existing enclosures, keep EAB connections
3. Connect controller device ports to loop switches
4. Connect existing enclosures to loop switches
5. Power on EVA6100 and management server
6. Check/rescan Command View, install new license
7. Power on servers
8. Add new enclosures and disks one by one (on-line)
Our downtime window is pretty reduced, about 1 hour.
Please, may you share with us any insight about this?
Any help will be vastly appreciated,
Thanks,
Albatross
1 REPLY 1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-11-2010 08:50 AM
02-11-2010 08:50 AM
Re: EVA4100 to 6100 migration plan
I'm assuming this is a data in place migration (you are not moving to another EVA in another cabinet).
Few quick thoughts:
- I would not plan on just one hour of application downtime; especially with moving cables, you might have some troubleshooting todo, and at our site, we had one eva where the HP FE skipped out after the install too quickly, and it took over a day of follow-on troubleshooting to fix things.
- it looks like you will wind up with all your new disks in the new shelves, which is not optimal from an RSS perspective. You might want to consult with HP re moving around the current disks prior to inserting the new ones. As I understand it, disks are tracked by their wwid, and the data *should* still be accessible even if moved to a different bay (slot).
Although I have not done a data-in-place migration like this before, I would find out if the controller wwid's would change, as that could require new zoning.
Few quick thoughts:
- I would not plan on just one hour of application downtime; especially with moving cables, you might have some troubleshooting todo, and at our site, we had one eva where the HP FE skipped out after the install too quickly, and it took over a day of follow-on troubleshooting to fix things.
- it looks like you will wind up with all your new disks in the new shelves, which is not optimal from an RSS perspective. You might want to consult with HP re moving around the current disks prior to inserting the new ones. As I understand it, disks are tracked by their wwid, and the data *should* still be accessible even if moved to a different bay (slot).
Although I have not done a data-in-place migration like this before, I would find out if the controller wwid's would change, as that could require new zoning.
check out evamgt.wetpaint.com and evamgt google group
The opinions expressed above are the personal opinions of the authors, not of Hewlett Packard Enterprise. By using this site, you accept the Terms of Use and Rules of Participation.