Disk Enclosures
cancel
Showing results for 
Search instead for 
Did you mean: 

Shutdowm VA7410 with more enclosures

Peter te Focht
Frequent Advisor

Shutdowm VA7410 with more enclosures

Hi,

We have to shut a VA7410 tonight. I don't remember in what sequence I have to power down the array. First the controller and afterwards the other disk-enclosures ?? And to start it up I think I have to powerup first the Enclosures and than the controller ?? Am I right ????
Thanks for help,

Cheers, Jan Poortman
2 REPLIES
Peter te Focht
Frequent Advisor

Re: Shutdowm VA7410 with more enclosures

Problem solved by Herman Vink HP Netherlands.
First Controller, wait until controller is shut. Then switch off the other enclosures.
Starting up is just the other way, first the JBOD's and last the controller.
Thanks, Jan
Peter te Focht
Frequent Advisor

Re: Shutdowm VA7410 with more enclosures

See answer by Herman Vink HP