Former HPE Products
cancel
Showing results for 
Search instead for 
Did you mean: 

Create a new results folder in HP Load Runner with Date for each load test

 
anans79
Visitor

Create a new results folder in HP Load Runner with Date for each load test

Please let me know a way to create the results folder dynamically for every run in load runner?

Like Load Test 1/15/2018, Load Test 1/16/2018, without changing results path settings manually everytime.

I'm using version 12.53

 

1 REPLY 1
Dennis Handly
Acclaimed Contributor

Re: Create a new results folder in MF Load Runner with Date for each load test

This is the wrong company for MF software questions. You need to register in the MF Software Forum:
https://community.softwaregrp.com/t5/LoadRunner-Practitioners-Forum/bd-p/sws-LoadRunner_SF