- Community Home
- >
- Storage
- >
- Midrange and Enterprise Storage
- >
- HPE EVA Storage
- >
- Re: Adding enclosures to EVA8400 gone wrong
HPE EVA Storage
1748150
Members
3485
Online
108758
Solutions
Forums
Categories
Company
Local Language
юдл
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Forums
Discussions
юдл
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Go to solution
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО01-19-2011 08:08 AM
тАО01-19-2011 08:08 AM
I have an EVA8400 running 09534000 and CommandView 9.3
I tried adding 5 new storage enclosures. I installed them in the rack, filled them full of shiny new drives, cabled them exactly as described in http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c02248317/c02248317.pdf but when I added the new enclosures to the 1st channel (green) all hell broke loose - the EVA "locked up" - it stopped serving LUNs, the messages "Too many HSV" showed on the front panel, along with some fault codes, and I had to restart both controllers manually from the front panel. Needless to say, it was a long night picking up all of the pieces.
What did I do wrong?
In the logs I have "A Fibre Channel port has transitioned to the FAILED state.
View corrective actionsCorrective action code: c3" which I completely expected, followed by "A Fibre Channel port has transitioned to the NORMAL state." which I also expected.
The termination log shows "Crash forced by other HSV450 controller." followed by "This HSV450 controller was requested to terminate operation in order to recover from a fast failover by remaining in single controller mode until the failover data in the cache can be completely flushed." about 17 minutes later; both of these were from controller A
I tried adding 5 new storage enclosures. I installed them in the rack, filled them full of shiny new drives, cabled them exactly as described in http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c02248317/c02248317.pdf but when I added the new enclosures to the 1st channel (green) all hell broke loose - the EVA "locked up" - it stopped serving LUNs, the messages "Too many HSV" showed on the front panel, along with some fault codes, and I had to restart both controllers manually from the front panel. Needless to say, it was a long night picking up all of the pieces.
What did I do wrong?
In the logs I have "A Fibre Channel port has transitioned to the FAILED state.
View corrective actionsCorrective action code: c3" which I completely expected, followed by "A Fibre Channel port has transitioned to the NORMAL state." which I also expected.
The termination log shows "Crash forced by other HSV450 controller." followed by "This HSV450 controller was requested to terminate operation in order to recover from a fast failover by remaining in single controller mode until the failover data in the cache can be completely flushed." about 17 minutes later; both of these were from controller A
Solved! Go to Solution.
2 REPLIES 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО01-20-2011 12:18 PM
тАО01-20-2011 12:18 PM
Solution
For what it's worth, I've done this (with HP onsite too) and it certainly is possible!
I guess the first thing I'd suggest is working with HP to do this, even though it's certainly something that should be possible for the end-user.
I assume you followed the "on-line" cabling guide? I'm wondering if what you got was because both paths on that loop were broken...which is a bad thing. Doing the "on-line" recabling should only break one loop path at a time and not both...so although you see errors in CV, they are temporary and go away when you reconnect the 2nd path.
(One side effect of doing it online is that you cant necessarily get all the shelves on the same loop next to each other.)
Not sure if any of that helps!
I guess the first thing I'd suggest is working with HP to do this, even though it's certainly something that should be possible for the end-user.
I assume you followed the "on-line" cabling guide? I'm wondering if what you got was because both paths on that loop were broken...which is a bad thing. Doing the "on-line" recabling should only break one loop path at a time and not both...so although you see errors in CV, they are temporary and go away when you reconnect the 2nd path.
(One side effect of doing it online is that you cant necessarily get all the shelves on the same loop next to each other.)
Not sure if any of that helps!
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО01-20-2011 01:41 PM
тАО01-20-2011 01:41 PM
Re: Adding enclosures to EVA8400 gone wrong
I can think of two things here...
1. Did you run the redundancy check before attempting this upgrade? Check can determine if all the paths to drive shelves are functioning or not. If you missed it, it's very big assumption that redundant connections were working on the EVA.
2. Are you adding all the 5 shelves to a single loop? How many shelves already existing on that loop. On EVA84000 each loop supports maximum of 9 shelves (a total of 27 shelves with 3 loops). Hope you are not crossing that limit.
1. Did you run the redundancy check before attempting this upgrade? Check can determine if all the paths to drive shelves are functioning or not. If you missed it, it's very big assumption that redundant connections were working on the EVA.
2. Are you adding all the 5 shelves to a single loop? How many shelves already existing on that loop. On EVA84000 each loop supports maximum of 9 shelves (a total of 27 shelves with 3 loops). Hope you are not crossing that limit.