- Community Home
- >
- Storage
- >
- Midrange and Enterprise Storage
- >
- HPE EVA Storage
- >
- MSA1000 + 2 MSA20: from active/passive to active/a...
HPE EVA Storage
1753913
Members
8708
Online
108810
Solutions
Forums
Categories
Company
Local Language
юдл
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Forums
Discussions
юдл
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Go to solution
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО05-03-2011 11:53 PM
тАО05-03-2011 11:53 PM
Hi all, i'm in the process of migrating our MSA1000 from active/passive to active/active.
We have :
SAN: 2 controllers, 2 MSA20 shelf populated, 2 SAN Switches 2/8 for MSA (inside the rear of msa case) configured for WWN zoning
SERVERS: 2 servers (a Windows 2003 cluster) with 2 HBA mounted but just one FC cable connected.
The second SAN switch is already configured for WWN zoning.
OBJECTIVE: Gain more speed in the SQL env by using MPIO Full Featured and paths in LB.
What do i think to do?:
-Backup backup backup!
-install MPIO full featured on the servers (the 2nd one first, reboot and check if disks GUID are preserved or not) if correct, proceed with the first one.
-hot-remove the passive controller.
-shutdown the entire cluster but the second node, on which i stop all the cluster groups and the cluster service.
-flash the first controller ***
-reboot the server, after done, and check if the disk GUID/LUNS are preserved or what.
-Start the cluster service and groups to check functionality.
-start the first node and check moving groups.
-Configure the MPIO to LB, reboot and check
-if everything's OK, done.
What do you think about it???
We have :
SAN: 2 controllers, 2 MSA20 shelf populated, 2 SAN Switches 2/8 for MSA (inside the rear of msa case) configured for WWN zoning
SERVERS: 2 servers (a Windows 2003 cluster) with 2 HBA mounted but just one FC cable connected.
The second SAN switch is already configured for WWN zoning.
OBJECTIVE: Gain more speed in the SQL env by using MPIO Full Featured and paths in LB.
What do i think to do?:
-Backup backup backup!
-install MPIO full featured on the servers (the 2nd one first, reboot and check if disks GUID are preserved or not) if correct, proceed with the first one.
-hot-remove the passive controller.
-shutdown the entire cluster but the second node, on which i stop all the cluster groups and the cluster service.
-flash the first controller ***
-reboot the server, after done, and check if the disk GUID/LUNS are preserved or what.
-Start the cluster service and groups to check functionality.
-start the first node and check moving groups.
-Configure the MPIO to LB, reboot and check
-if everything's OK, done.
What do you think about it???
Diego C.
MS MCSA Server 2003
HP Accredited Integration Specialist
MS MCSA Server 2003
HP Accredited Integration Specialist
Solved! Go to Solution.
2 REPLIES 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО05-04-2011 12:45 AM
тАО05-04-2011 12:45 AM
Solution
Looks ok but if you bring the MSA up with a single controller then you should expect a FC link down error from the MSA and of course the alternate path will not be found by the servers until the second controller is up, I too prefer to upgrade one controller with the second removed as this allows failback. Also since the full featured MPIO DSM actually "talks" to the MSA controllers the startup and discovery on boot will take a bit longer than before so don't panic.
_________________________________________________
How to assign points on this new forum? Click the Kudos Star!
How to assign points on this new forum? Click the Kudos Star!
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО05-04-2011 12:53 AM
тАО05-04-2011 12:53 AM
Re: MSA1000 + 2 MSA20: from active/passive to active/active
Thank you GreyBeard, i forgot to mention that i want to insert the second controller if LUNS and disks GUID are OK after the flash and cluster service and groups starts fine.
:-)
Thanks again.
:-)
Thanks again.
Diego C.
MS MCSA Server 2003
HP Accredited Integration Specialist
MS MCSA Server 2003
HP Accredited Integration Specialist