Re: IMC Deploy device software ISSU

 
Daddy72
Occasional Contributor

IMC Deploy device software ISSU

Hello,

I'm trying to use Deploy Software on device using ISSU feature on IMC.

The goal is to upgrade a stack of 4 units.

I did the deployment and the entire stack was succesfully upgraded by IMC unsing ISSU.

However, IMC reboot 2 switches of four (in my case) in the same time. So, the upgarde is done in the 2 first switches and then in the 2 last switches. How can we control the order IMC do the upgarde ?

Should IMC upgrade the switches with ISSU one after one in order to garantee the high availability ?

For example, I have a stack of 4 units, in my core switch and the link-aggregation to the access switches are made on the unit 3 and unit 4. I want to control the upgrade process to be sure the unit 3 and unit are not rebooted at the same time. In the lab I prepared to test this functionnality, the uni3 and unit4 were rebooted at the same time.

I dind't find information on the guide

Thanks

David

1 REPLY 1
ibias
Regular Advisor

Re: IMC Deploy device software ISSU

If no information in the field is available, then I will ask the HPE PLM and come back, if I got an answer.