- Community Home
- >
- Storage
- >
- Entry Storage Systems
- >
- MSA Storage
- >
- MSA 2050 replacement of whole unit
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-08-2019 02:38 AM
07-08-2019 02:38 AM
Hello, I would like to check on what is the best way to replace the whole unit of my MSA 2050 (which is still working).
I have found the guide for replacing chassis and guide for replacing controller module individually.
I have a question on whether configuration setting is required on the new controller in a dual controller config or will it synchronise between the old and the new set?
If it can synchronise, does it mean I can make use of the existing unit to synchronise my new controllers one by one, then removing them and the hard disks and placing them into the new MSA 2050 unit without any settings required?
Solved! Go to Solution.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-08-2019 07:48 AM
07-08-2019 07:48 AM
SolutionHello,
I am not sure exactly what you are trying to accomplish. When you ask about replacing the whole unit that implies you have an issue which you are trying to solve by replacing. Yet you ask the question about the configuration, which seems to imply you are trying to copy the configuration to a second system.
If you replace one controller at a time, the new controller will copy all of the old configuration. Theoretically you can then take those two new controllers and place in a new system. However, doing the configuration in this manner means you will have the same IP addresses for the management controllers along with the same WWN for the host ports. If both arrays have the same configuration you might have a conflict on your SAN.
Additionally, if your original MSA 2050 has an issue, then swapping in controllers might copy whatever issue exists on the original array to the new controllers. This might not solve your issue. If you are more concerned about the configuration so that you have a second array configured the same as your first array there are steps you can take to copy the key configuration details and then set up your new array with those configuration details.
Hopefully, this helps. Please detail out additional information if more assistance is needed. Additionally, your system should still be under warranty. This means you could get HPE Support for further assistance.
Cheers,
Shawn
I work for Hewlett Packard Enterprise. The comments in this post are my own and do not represent an official reply from HPE. No warranty or guarantees of any kind are expressed in my reply.
I work for HPE