Operating System - Microsoft

ROK Windows deliveries have long leadtime. Is it possible to download instead of waiting on medium?

 
micheleL
Occasional Visitor

ROK Windows deliveries have long leadtime. Is it possible to download instead of waiting on medium?

ROK Windows  deliveries have long leadtime. Is it possible to download instead of waiting on medium? 

1 REPLY 1
ManBha
HPE Pro

Re: ROK Windows deliveries have long leadtime. Is it possible to download instead of waiting on medi

Hello,

 

The Windows ROK kit is not available for download.

 

Thanks.

 

 

I work for HPE

Accept or Kudo