Online Expert Day - HPE Data Storage - Live Now
April 24/25 - Online Expert Day - HPE Data Storage - Live Now
Read more
ProCurve / ProVision-Based
cancel
Showing results for 
Search instead for 
Did you mean: 

ProCurve 2920 stacking modules

Aquarium
Occasional Collector

ProCurve 2920 stacking modules

 

Hi,

I have some ProCurve 2920 switches with stacking modules and in case of failure, I would know if they are hot-swappable or I have to turn off the switch with failed module and replace it??

Thanks!

1 REPLY
Richard Litchfield
Respected Contributor

Re: ProCurve 2920 stacking modules

The switch will reboot when it rejoins the stack anyway (to make sure it has the current config)... If you have availability concerns, you need to make sure your device (eg server, switch) is connected to both switches in the stack with an LACP connection.