- Community Home
- >
- Servers and Operating Systems
- >
- HPE ProLiant
- >
- ProLiant Servers (ML,DL,SL)
- >
- Freezing problems during verify phase of backup.
ProLiant Servers (ML,DL,SL)
1752795
Members
6565
Online
108789
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
01-03-2001 04:00 PM
01-03-2001 04:00 PM
Freezing problems during verify phase of backup.
We have a Proliant 3000 that has exhibited a problem only after upgrading to NT4 Service Pack 6a.
When running a backup using ArcServe 6.5 the backup portion works fine, but during the verify with CRC phase the machine drops off the LAN, and becomes extremely sluggish to respond on the console. If left alone, the backup does complete successfully but the CPU utilization in Perfmon stays at 90%+ We have tracked the apparent cause down to a very high level of interrupts being generated during the verify phase. Normal operation is about 200-300 int's /sec. During verify this jumps to about 50k/sec. A reboot brings everything back to normal. If backup is NOT run, the server works perfectly day-in, day-out.We have loaded the latest patches, firmware versions etc. Also tried Backup exec & Nt backup. Same fault. Replaced tape drive, ran tape drive off internal scsi port and a 2940 pci scsi card, tried different scsi cable. All to no effect. Our vendor told me there was a compaq notice about old netelligent NIC cards failing after sp6a is installed but I cannot find this on the web site. Can anyone confirm this?
Thanks...Glenn
When running a backup using ArcServe 6.5 the backup portion works fine, but during the verify with CRC phase the machine drops off the LAN, and becomes extremely sluggish to respond on the console. If left alone, the backup does complete successfully but the CPU utilization in Perfmon stays at 90%+ We have tracked the apparent cause down to a very high level of interrupts being generated during the verify phase. Normal operation is about 200-300 int's /sec. During verify this jumps to about 50k/sec. A reboot brings everything back to normal. If backup is NOT run, the server works perfectly day-in, day-out.We have loaded the latest patches, firmware versions etc. Also tried Backup exec & Nt backup. Same fault. Replaced tape drive, ran tape drive off internal scsi port and a 2940 pci scsi card, tried different scsi cable. All to no effect. Our vendor told me there was a compaq notice about old netelligent NIC cards failing after sp6a is installed but I cannot find this on the web site. Can anyone confirm this?
Thanks...Glenn
1 REPLY 1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-14-2001 04:00 PM
02-14-2001 04:00 PM
Re: Freezing problems during verify phase of backup.
I couldn't find any notes that referred to nic failures after sp6a either..... If you're still working on this email us at support@compaq.com
The opinions expressed above are the personal opinions of the authors, not of Hewlett Packard Enterprise. By using this site, you accept the Terms of Use and Rules of Participation.
News and Events
Support
© Copyright 2024 Hewlett Packard Enterprise Development LP