ML150 G6 BBWC Install

 
Ant Holloway
Occasional Visitor

ML150 G6 BBWC Install

Hi,

I'm trying to install the BBWC upgrade for the P410 storage controller on a ML150 G6 server. I've checked the install guide for both the controller and the server itself and everything is easy other than where the battery is supposed to clip into the case. The server guide provides the text "install the battery" with a picture of what I assume is the bottom of the ML110's case, as it lacks the second drive cage area of the ML150.

Any help with where the battery is supposed to sit would be greatly appreciated.