Server Test

I need to remotely test backup A/D on a DL380 G8 system. In Netware you could DOWN a server leaving the power to the server on. Is this possible using iLo so that I can bring the server back up?  If not, I'll have to have someone physically present in the server rooom.

 

Thanks

1 REPLY
Johan Guldmyr
Honored Contributor

Re: Server Test

Hi, yes it has.

 

You could power off the server from within the OS and then from iLO you can power it back on again.