Coming soon: a much simpler Servers and Operating Systems section of the Community. We will combine many of the older boards, and you won't have to click through so many levels to get at the information you need. If you are looking for an older board and do not find it, check the consolidated boards, as the posts are still there.
Servers - General
cancel
Showing results for 
Search instead for 
Did you mean: 

Update the battery recharge date label.

Diego Brianza
Occasional Advisor

Update the battery recharge date label.

Hi, I have two R 5500 XR UPS on a blade system.

 

Now I change the 2 battery pack un the 1° UPS.

 

The manual say "Update the battery recharge date label." I see in the web managment console on the UPS that the Battery Installed Date are the firt installed date (1/05/2008). Is not a problem, all works ... but I want to change this date with the correct date.

 

The manual don't help me.

 

Thanks.

 

 

P.S. this thread has been moved from BladeSystem > Chassis, Power & Cooling to Server > general. - Hp Forum Moderator