HPE EVA Storage
1752587 Members
3829 Online
108788 Solutions
New Discussion юеВ

Re: After hard shutdown, now link to switch failed ?

 
SOLVED
Go to solution
Server-Support
Super Advisor

After hard shutdown, now link to switch failed ?

People,

Due to sudden power outage and not enough UPS power, my EVA 6300 is turned off abruptly today.

But then it comes back online again after the power resume in my Data Center, but then I got this error:

Controller 1Controller 1Controller 2Controller 2

 

This is happening in both Controllers as above. There is no cables removed from the EVA array to the server HBA.

Any help would be greatly appreciated. 

Best regards,
5 REPLIES 5
Torsten.
Acclaimed Contributor
Solution

Re: After hard shutdown, now link to switch failed ?

>> There is no cables removed from the EVA array to the server HBA

 

Is it a direct connection between EVA and server?

Is the server already up and running?


Hope this helps!
Regards
Torsten.

__________________________________________________
There are only 10 types of people in the world -
those who understand binary, and those who don't.

__________________________________________________
No support by private messages. Please ask the forum!

If you feel this was helpful please click the KUDOS! thumb below!   
Cali
Honored Contributor

Re: After hard shutdown, now link to switch failed ?

Click on "More details" and check if Direct or Loop mode is set.

ACP IT Solutions AGI'm not an HPE employee, so I can be wrong.
Server-Support
Super Advisor

Re: After hard shutdown, now link to switch failed ?

@Cali what is direct loop ?

EVA 6300EVA 6300

Best regards,
Server-Support
Super Advisor

Re: After hard shutdown, now link to switch failed ?

@Torsten. yes, you are right. the server reboot was taking too long, hence it is not clearing it by itself within 1 hour.

After 1 hour of server reboot, everything is back to normal :-)

Best regards,
Cali
Honored Contributor

Re: After hard shutdown, now link to switch failed ?

Loop = Server is connected direct to the Array

Direct = Storage is connected to an FC-Switch

ACP IT Solutions AGI'm not an HPE employee, so I can be wrong.