- Community Home
- >
- Servers and Operating Systems
- >
- Operating Systems
- >
- Operating System - HP-UX
- >
- Re: Rolling Upgrade
Operating System - HP-UX
1752794
Members
7062
Online
108789
Solutions
Forums
Categories
Company
Local Language
юдл
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Forums
Discussions
юдл
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Go to solution
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО07-10-2009 03:29 AM
тАО07-10-2009 03:29 AM
Re: Rolling Upgrade
Hi
As I have advised in my first post that you need to take care of Disk Space. 11i v2 requires little bit more space
Atleast below 3 Filesystems required these minimum space
/var should be 4.7 GB
/opt should be 3.8 GB
/usr should be 5.1 GB
Regards
Sanjeev
As I have advised in my first post that you need to take care of Disk Space. 11i v2 requires little bit more space
Atleast below 3 Filesystems required these minimum space
/var should be 4.7 GB
/opt should be 3.8 GB
/usr should be 5.1 GB
Regards
Sanjeev
Everything is Possible as " IMPOSSIBLE" word itself says I M POSSIBLE
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО07-13-2009 12:30 AM
тАО07-13-2009 12:30 AM
Re: Rolling Upgrade
Hi,
I already have the first node in 11iv2.
A little resume of what I do, to the community:
- Resize the FS with ( Tape_recovery )
- Check firmware ( update if necessary )
- Update update-ux ( latest version )
- uninstall ssh ( the version is more recent than that will be installed )
- Run upgrade-ux
The only issue that I have is that upgrade-ux remove my Mirror software, I have to re-install the software.
The SG is in same version and working. Today I will do the same procedure to the other node and summarize.
Thanks to all !! ..
Points Assign !!
Regards.
I already have the first node in 11iv2.
A little resume of what I do, to the community:
- Resize the FS with ( Tape_recovery )
- Check firmware ( update if necessary )
- Update update-ux ( latest version )
- uninstall ssh ( the version is more recent than that will be installed )
- Run upgrade-ux
The only issue that I have is that upgrade-ux remove my Mirror software, I have to re-install the software.
The SG is in same version and working. Today I will do the same procedure to the other node and summarize.
Thanks to all !! ..
Points Assign !!
Regards.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО07-14-2009 01:43 AM
тАО07-14-2009 01:43 AM
Re: Rolling Upgrade
Hi All
I already finish the upgrade from both nodes to 11iv2.
I only have a little problem with space in FS and some software that already have installed a recent version that the one it will be installed in 11iv2.
SG is running with 25 packages including 1 Oracle RAC.
Regards!! ..
I already finish the upgrade from both nodes to 11iv2.
I only have a little problem with space in FS and some software that already have installed a recent version that the one it will be installed in 11iv2.
SG is running with 25 packages including 1 Oracle RAC.
Regards!! ..
- « Previous
-
- 1
- 2
- Next »
The opinions expressed above are the personal opinions of the authors, not of Hewlett Packard Enterprise. By using this site, you accept the Terms of Use and Rules of Participation.
News and Events
Support
© Copyright 2024 Hewlett Packard Enterprise Development LP