- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- 3-Phase 16A PDU & c7000 BladeSystem enclosure ques...
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
08-05-2010 07:06 AM
08-05-2010 07:06 AM
3-Phase 16A PDU & c7000 BladeSystem enclosure question
Martin had a customer question regarding input power for a c7000 enclosure:
***************************************************************
My customer wants to install a 3 Phase 16A C7000 enclosure in a 47U rack with on both sides two 1 phase 16A PDU’s.
Can he cut the wires and connect 3 CEE 7/7 “Schuko” European power cords (1 Phase 16A) on each Feed of the enclosure.
Can it technically, and is this supported?
****************************************************************
Juergen had some info for Martin:
***********************************************************
Hello Martin
If I understand your request right the customer wants to do modifications on both 3-phase power cords directly attached to the HP BladeSystem enclosure. A 3-phase connection typically means in EMEA about 400V phase-to-phase, and 230V phase-to-neutral. In general, this modification will have an impact on the enclosure warranty. But beside of this, 3-phase 16A provides 3x the power of a single-phase 16A line (11kVA vs. 3,7kVA). As a result, connecting the modified 3-phase power cords to a single-phase PDU (3,7kVA) will overload this one.
Another reason not to do this, there is no power outlet for CEE 7/7 “Schuko” on any of our HP PDUs.
What is the reason for this action, is there no 3-phase outlet available onsite?
If yes, the electrician may provide a separate junction box with breakers to do the job without impact on enclosure warranty.
If I’ve misunderstood the request please provide some more details and I’ll try again.
******************************************************************
We hope this helped you. Let us know if you have questions.