- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Re: Changing Module positions in the back of C- Cl...
BladeSystem - General
1753806
Members
7650
Online
108805
Solutions
Forums
Categories
Company
Local Language
юдл
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Forums
Discussions
юдл
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-25-2008 04:29 AM
тАО02-25-2008 04:29 AM
Changing Module positions in the back of C- Class Chassis
We have 2 C Class blade chassis and 2 HP EVA SAN's, in the rear of the hp chassis we have 4 Cisco switches and 2 brocade modules to connect the fibre to the san, we bought the blade / san's several months apart as we wanted to setup a failover vmware environment. unfortunatly the positions of the modules at the rear of the chassis dont mirror each other (from top to bottom we have cisco / brocade / cisco) and in the second one we have cisco / cisco / brocade) my question is if i brought the relevent blade servers down and changed the positions of the brocades would the san disks (and more importantly the data!) still be presented to the servers? or would i need to move the data (possibly to local storage), re present and move the data back? (obviously i would need to move the mezzanine cards in the rear of the blade servers where applicable)
If anyone has tried this i would be grateful for advice / do's and dont's
As always many thanks in advance,
Kind regards,
Simon
If anyone has tried this i would be grateful for advice / do's and dont's
As always many thanks in advance,
Kind regards,
Simon
2 REPLIES 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-25-2008 06:16 AM
тАО02-25-2008 06:16 AM
Re: Changing Module positions in the back of C- Class Chassis
Take a look at this document, page 6.
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01096654/c01096654.pdf
Integrated NICs are connected to bays 1 & 2
Mezzanine 1 is connected to bays 3 & 4
Mezzanine 2 is connected to bays 5 & 6
The kind of mezzanine (ethernet / fiber channel) and the kind of switch on the back should match. Right now you must have a mismatch on one side or the other.
The definition of the hosts on the EVA is done by the WWN of the FC mezzanine on each blade, so changing the position of the switch or mezzanine does not interrupt the access to disks (as long as zoning is OK).
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01096654/c01096654.pdf
Integrated NICs are connected to bays 1 & 2
Mezzanine 1 is connected to bays 3 & 4
Mezzanine 2 is connected to bays 5 & 6
The kind of mezzanine (ethernet / fiber channel) and the kind of switch on the back should match. Right now you must have a mismatch on one side or the other.
The definition of the hosts on the EVA is done by the WWN of the FC mezzanine on each blade, so changing the position of the switch or mezzanine does not interrupt the access to disks (as long as zoning is OK).
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-28-2008 10:16 AM
тАО02-28-2008 10:16 AM
Re: Changing Module positions in the back of C- Class Chassis
Thanks for the infomation, we powered down the blades, moved the mezzanine cards where applicable, powered off the blade chassis and moved the switches / brocade and powered back on, each blade came up and the san storage / networking was fine