powering off p-class and c-class enclosures

 
SOLVED
Go to solution
the doctor_1
Occasional Advisor

powering off p-class and c-class enclosures

Does anyone know the proper procedure for completely powering off the blade enclosures? Our building is having a planned power outage. After powering the servers down, is there a way to power down the enclosures other than yanking the cables out of the power supplies?
4 REPLIES 4
Raghuarch
Honored Contributor
Solution

Re: powering off p-class and c-class enclosures

is there a way to power down the enclosures other than yanking the cables out of the power supplies?

No there is no way after Shutting down the blades. You can Power off the interconnect modules. Then you need to remove the cables from the Power supplies.
itsme
Advisor

Re: powering off p-class and c-class enclosures

I am assuming that reversing the steps is the proper way to power it back on. Would that be correct and is there any caveats?
Raghuarch
Honored Contributor

Re: powering off p-class and c-class enclosures

Yes you are right.... Its Recommended.
Power on then Insert all the Blades.
ThomasO
Frequent Advisor

Re: powering off p-class and c-class enclosures

If you have a scalable bus bar (at least available with p-Class), there are two power switches for each server shelf where you can power down the entire shelf.

If you don't have this scalable bus bar, you need to unplug the main power as mentioned already.