Update Order - Power Mgmt Controller 3.4(D) with OA 2.25

 
Bob Firek
Regular Advisor

Update Order - Power Mgmt Controller 3.4(D) with OA 2.25

I have a c7000 enclosure with 10 - BL460c G1 blades all with iLO2 1.78, ROM 05/12/2009 and OA 2.25. I just discovered that the power mgmt controller version on these blades is .7.

My upgrade plan is to upgrade to OA 2.32 and then VC 2.10 and then jump to OA 2.52 and VC 2.30. The reason for the split is to avoid any PowerPIC issues.

My question is should I update the blades to PMC 3.4(D) before up grading upgrading to OA 2.32 or after. From what I've read it seems like the blades do not have a problem with the controller version level until OA 2.50 and above.

Any advice will be greatly appreciated
.