- Community Home
- >
- Storage
- >
- Midrange and Enterprise Storage
- >
- HPE EVA Storage
- >
- HP P2000 G3
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
12-08-2014 02:37 AM
12-08-2014 02:37 AM
HP P2000 G3
Hi every one,
I hope any one can help me in this case.
I want to do remote replication between two HP P2000 G3 dual FC controllers systems separated in two different sites. unfortunately the current infrastructure connection between the two sites is limited to fit FC connection. so we find that the most suitable solution to fit our WAN connection is to replace the current FC controllers by FC/iSCSI combo controllers to use the iSCSI ports for replication through our Ethernet WAN connection! regardless the cost,
- what I need to take care about before advancing the process?
- do I need to power down the systems while replacing the controllers?
- can I replace the controllers in each system one by one -although as per HP doc. : it's not allowed to mix different
types of controllers- or replacing the tow controllers together?
- for time saving can I do the replication between the two systems by the FC first in one of the two sites then replacing
the controllers (FC/iSCSI) and relocating the systems back again to its location
- what about licensing required? and how it will fit the above?
thanks for your help.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
12-09-2014 03:40 AM
12-09-2014 03:40 AM
Re: HP P2000 G3
You need this manual. http://www.storagenetworks.com/documents/solutionguides/hp_p2000_remotesnap_technical_cookbook.pdf
How to assign points on this new forum? Click the Kudos Star!
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
12-09-2014 05:27 AM
12-09-2014 05:27 AM
Re: HP P2000 G3
Hi Greybeard,
thank you for your help. I will check it.