HPE EVA Storage
1751898 Members
5849 Online
108783 Solutions
New Discussion юеВ

Re: SAN Switch conflict full mesh

 
mas1
Advisor

SAN Switch conflict full mesh

Hi my friends
i have 2 SAN Switches 8/24 B series and 4 SAN switches 8/24 C class on 2 enclosures C7000. When i connect from 1 SAN switche on 1 enclosure to both SAN switches 8/24 b series with 2 lines LC/LC cable conflict error log show to me. I config on SAN switches 8/24 b series zoning. If i erase zoning this error not show.
If i disconnect one cable from SAN switch 8/24 c class to SAN switch b series this error not show.
I want full mesh cabling in SAN network.If i disconnect on cable, full mesh cabling denied. and when i erase zoning, my fabric is flat and my MSL2024 accessible for all server in my fabric and all servers connect to fabric starting to initializing MSL2024.
Please help me
Regards
3 REPLIES 3
gregersenj
Honored Contributor

Re: SAN Switch conflict full mesh

Did you remember to set the Switch ID.

Default ID on a brocade is ID 1.

First setting to change is the ID and the IP address.

BR
/jag

Accept or Kudo

mas1
Advisor

Re: SAN Switch conflict full mesh

hi friend
i changed Domain ID and default IP on all switches
sw1=id1
sw2=id2
sw3=id3
....etc
gregersenj
Honored Contributor

Re: SAN Switch conflict full mesh

I will recommend to never use ID 1.

Since the default ID is 1. Whenever you add a new switch or replace a switch.
The the new switch will have ID 1 untill you change it.
So if you forget to chenge ID before you add it to a fabric, you will get some bad results.

BR
/jag

Accept or Kudo