Networking
Find answers to your questions about Networking.
Switching and Routing
Showing results for 
Search instead for 
Do you mean 

Hewlett Packard Enterprise Community

Join the conversation with experts and colleagues to get advice, discuss issues, and find solutions
Posted to:
Original author:
We are upgrading on a brand new linux server, we were advised to load our current version on that server. This took about 5 hours? This seems extremly long? Then we will upgrade to 10.0 and then upgrade to 10.20. What has been everyones experience on...
Posted to:
Original author:
Hello guys. I've got this router since 05.2014 ive got a problem with configure this device with my adsl line but finnally i have done it. 5 days ago it lost adsl connection. Interface showing DOWN.... and i dont have idea why? Another router connect...
Posted to:
Original author:
What is the point of releasing the update when it states in notes: Release 2422P03 This release has the following changes: None
Posted to:
Original author:
Hi folks, My customer has got a couple of older ProCurve 2910al switches, both with 10GbE SFP+ modules (last firmware). I plan to upgrade their network and replace some even older switches with HPE 1950 switches. From the specs it seems possible to c...
Posted to:
Original author:
I have followed steps on setting up irf with 3 HPE 1950 JG963A switches, and still can't get it to work, I don't know what I am doing wrong, is there anyone that can help or lead me on how to accomplish this correctly?
Posted to:
Original author:
I formatted the switch becasue it was having issues so i figured it would be eaiser to reload. I go into Basic Boot Menu, Update Full Bootrom , use Xmodem to transfer the firmware that i downloaded from here 1950_7.10.R3115P03 upload the 1950_7.10.R3...
Posted to:
Original author:
OK having looked at this further I have found a simple fix for this issue. HNS is expecting an environment variable of VBOX_INSTALL_PATH to be set, it looks like this has changed in the latest version of virtual box to a different name. So to resolve...
Posted to:
Original author:
Aecro, Q : Is it possible to connect each Cisco access switch to each of the two backbone switches, without having spanning-tree shutting one link down? A : No Distributed Trunking is a feature of the "full" ProVision chipset switches such...
Posted to:
Original author:
Hi Robert, In the simplest form, I used to remember a 'Tagged' port as an inter-switch link and an 'Untagged' port as a host port. Basically, its all about the VLAN information that gets 'tagged'into the Ethernet frame. When you configure a port as '...
  • Legend
  • New MessagesNew Messages
  • No New Messages No New Messages
  • Hot ThreadHot Thread
  • Replied-to Thread Replied-to Thread
  • Read Only ThreadRead Only Thread
Events
Nov 29 - Dec 1
London
Discover 2016 London
Learn how to thrive in a world of digital transformation at our biggest event of the year, Discover 2016 London, November 29 - December 1.
Read more
Each Month in 2016
Online
Software Expert Days - 2016
Join us online to talk directly with our Software experts during online Expert Days. Find information here about past, current, and upcoming Expert Da...
Read more
View all
Top Authors
Honored Contributor
84
Honored Contributor
95
Trusted Contributor
27
View all