Server Management - Systems Insight Manager
1825769 Members
2016 Online
109687 Solutions
New Discussion

Re: PMP Problems with Reports

 
juergen.mettenbechtle.c
Occasional Advisor

PMP Problems with Reports

i have Problems with System Summary Reports and Static Analysis Reports.
Spezialy with the Input of the Start- and End-Date.
I think the reason are the regionalsettings.
HPSIM 4.2 and PMP 3.1 are installed on the same Server on Windows 2000 SP4 German and SQL Server 2000 SP3 German.
I tried to change the Regionalsettings from the SQL Server, OS, and ODBC-System-DSN PMP_V3_0 from German to Englisch.
But nothing fix the Problem.
When i enter the Dates in any formats, one from the following Errormessages appear.
"Date cannot be earlier then xxx" or "enter date earlier than or equal to the today's date"

Anybody knows, how it works ?
1 REPLY 1
Erhard Pütz
Advisor

Re: PMP Problems with Reports

Hi,

I have got the same problem. I could not solve it but I guess I found why it is not working (I just opened a HP case about that and you should do so as well).

I installed my server earlier this year, but when I call Static Analysis Report, it shows an earliest and latest configuration date of 08/06/2005. When the date format is mm/dd/yyyy that means I will install the server next month.

So if you punch in a from date of 07/25/2005 (yesterday) that is before the first configuration date (which I think has probably day and month mixed up).

If you punch in a from and to date of 08/06/2005 that doesn't work because it is in the future.

Do you agree about what I found out?

Regards,

Erhard