1753470 Members
4824 Online
108794 Solutions
New Discussion

Interconnect bay rules

 
SOLVED
Go to solution
Tom Kunkel
Frequent Advisor

Interconnect bay rules

I wonder if this is a workable configuration for a cheap DR solution with a c7000 chassis:

Bay1 - Flex10

Bay2 - empty

Bay3 - 4Gbps FC pass-through

Bay4 - 4Gbps FC pass-through

Bay 5 - GigE Ethernet Passthrough

Bay 6 - GigE Ethernet Passthrough

 

I am *hoping* to avoid having to fork out for a second Flex10, as we will not be requiring it.

2 REPLIES 2
OliverAn
Advisor

Re: Interconnect bay rules

As far as I know the only rule is, that ypou cannot mix technologies (ETH/SAN/VC) in adjacent bays. So your configuration must be supported.

Matti_Kurkela
Honored Contributor
Solution

Re: Interconnect bay rules

Workable - yes, but you will be missing the functionality of one Flex10 NIC per blade slot.

 

Half-height blades have two integrated NICs: one of them will be routed to Bay 1, the other to Bay 2.

Full-height blades occupy two blade slots each, so they have four integrated NICs: two routed to Bay 1, and the other two to Bay 2.

 

If you leave Bay 2 empty, the NICs connected to that bay will be inoperative, but the configuration is workable with that caveat.

 

I hope you aren't plugging quad-port NIC mezzanine cards to the blades either: the routing for Mezz 2 (and 3 for full-height blades) splits the ports across all four bays 5-8. If you're going for dual-port NICs in Mezz 2, filling only bays 5 and 6 is enough for full functionality.

MK