- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Re: Shared Uplink for VC in Bay2 is the Linked/Act...
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Forums
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
06-11-2009 05:24 AM
06-11-2009 05:24 AM
Shared Uplink for VC in Bay2 is the Linked/Active, not VC1
The shared uplink set in VC2 Bay 2 is defaulting to Linked/Active instead of VC1 Bay 1.
VC1's connections are two 1GB fiber cables which is a 2GB port-channel from the switch, into a shared-uplink set.
VC2's connections are two 1GB copper cables which is also a 2GB port-channel from the switch, into a shared-uplink set.
All four of the cables are part of the same shared uplink set (all vlans available on switch are trunked and tagged from the switch)for redundancy if the active VC fails.
Why is it defaulting to VC2 as the linked/active pair and VC1 as the linked/standby?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
06-11-2009 01:43 PM
06-11-2009 01:43 PM
Re: Shared Uplink for VC in Bay2 is the Linked/Active, not VC1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
06-11-2009 10:53 PM
06-11-2009 10:53 PM
Re: Shared Uplink for VC in Bay2 is the Linked/Active, not VC1
At one point I think it used to calculate the number of downlink ports on the modules themselves and chose the active uplinks based on the module with the most number of downlinks in those networks but that was probably many fw revs ago.
Look at the Hardware Overview and what VC reports as the MAC address of the connected switch.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
06-12-2009 03:02 AM
06-12-2009 03:02 AM
Re: Shared Uplink for VC in Bay2 is the Linked/Active, not VC1
I believe that this is the correct behaviour when uplinks on different vc modules are contained in the same uplink set.
(I may be wrong, and if I am, I'm sure that someone with better information will respond).
I assume that you are doing NIC Teaming on the host, so that you can have network redundancy? If this is so, then this is the configuration (we) use.
The problem can be resolved by creating an Uplink Set on each VC module (with different names, e.g. UPLNK_A, UPLNK_B).
For each vLAN on the current Uplink set, create an ethernet network, say
Assign the
Now, in your server profile, assign (Teamed) NIC 1 to
You should find that both Uplink Sets show up as Linked/Active.
Also, if you think it through you will find that this configuration provides the network redundancy that you are after.
Note: 1. VC Modules failover horizontally (not vertically, so your VC modules should be installed in horizontal pairs.
2. Failover between VC modules takes ~25 seconds, so unless your systems/clusters can tolerate this, NIC Teaming on the blade is a must.
3. Considering Note 1. Your teamed NIC's must be assigned to VC modules which are a horizontal pair, in which case (with the above configuration) failover is immediate.
HTH
Dave.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
06-15-2009 11:39 AM
06-15-2009 11:39 AM
Re: Shared Uplink for VC in Bay2 is the Linked/Active, not VC1
WFH-WI: Powering down the active VC2 fails it over to VC1, but then fails back to VC2 once it is powered back on.
HEM: This is interesting, I may have to call HP Engineering support on this one. Thanks for the tip.
The Brit: All four of my connections are in the same uplink set so I can have VC redundancy and not NIC redundancy as my server NICs are dual-homed with different vlans/IPs. I have port-channeled each pair of 1GB cables from the 6509 to channel 2GB to each VC. Should I lose once of my 1GB port-channels I still have 1GB of bandwidth and I won't have to failover the VC. All vlans available on my 6509s are trunked to each VC, and each vlan has a tagged ethernet entry created in the uplink set. My VCs are in BAY1 and BAY2 for the redundancy.
-------------------------------------------
Long story short, there is really no risk to VC2/BAY2 being the linked/active connections, but more of a "clean-living" scenario. However, I do want to get to the bottom of this. I will start with HEM's suggestion first at this point.