GreenLake Administration
- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Uplink Failure Detection in HP BLc GbE2c LY 2/3 Sw...
BladeSystem - General
1855040
Members
6245
Online
104109
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Knowledge Base
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Knowledge Base
Forums
Discussions
- Cloud Mentoring and Education
- Software - General
- HPE OneView
- HPE Ezmeral Software platform
- HPE OpsRamp
Knowledge Base
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
10-09-2009 11:16 PM
10-09-2009 11:16 PM
Uplink Failure Detection in HP BLc GbE2c LY 2/3 Switch
Hi All,
I've in my design 4 HP BLc GbE2c LY 2/3 Switches, on VC Cards 1/2 I have only one upload link per VC card and I've enabled the UFD and the failover is working properly, for VC cards 3/4 I've 2 upload links per VC cards in two different VLANs, when enabled and configuring the UFD I’ve got an error and configurations can’t be saved, after checking the logs I found that I can’t add more than upload link to enable the UFD.
I have to have access links, and I don’t want to have a trunk link.
Any idea how this should works?
Thanks,
Mohamed
I've in my design 4 HP BLc GbE2c LY 2/3 Switches, on VC Cards 1/2 I have only one upload link per VC card and I've enabled the UFD and the failover is working properly, for VC cards 3/4 I've 2 upload links per VC cards in two different VLANs, when enabled and configuring the UFD I’ve got an error and configurations can’t be saved, after checking the logs I found that I can’t add more than upload link to enable the UFD.
I have to have access links, and I don’t want to have a trunk link.
Any idea how this should works?
Thanks,
Mohamed
1 REPLY 1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
10-23-2009 03:44 PM
10-23-2009 03:44 PM
Re: Uplink Failure Detection in HP BLc GbE2c LY 2/3 Switch
no response for this question
The opinions expressed above are the personal opinions of the authors, not of Hewlett Packard Enterprise. By using this site, you accept the Terms of Use and Rules of Participation.
Company
Events and news
Customer resources
© Copyright 2026 Hewlett Packard Enterprise Development LP