- Community Home
- >
- Software
- >
- HPE OneView
- >
- Migration from VCM to Oneview 3.1
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Discussions
Forums
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО11-14-2017 03:47 AM - last edited on тАО11-14-2017 10:25 PM by Parvez_Admin
тАО11-14-2017 03:47 AM - last edited on тАО11-14-2017 10:25 PM by Parvez_Admin
Migration from VCM to Oneview 3.1
We want to migrate a couple of enclosures from VCM to Oneview.
We are running into issues that a connection can't be found.
the message does not make sense because we have two VC ethenetnet modules with 6-8 connections from each server in bay 1 and 2 and two Fibre Vc modules (8GB / 20 Port) in bay 3 and 4 connected to a fibre HBA Mezzanine card.
Enclosure Serial Number:Confidential Info Erased
OA firmware 4.60
VC Ethernert firmware: 4.60
VC FC modules firmware: 2.15
HP Oneview version: 3.10.04-0299553
Migration Compatibility Report for Enclosure INWCEC01T2-U1-M1-F11
Overview
The enclosure "INWCEC01T2-U1-M1-F11", and the following resources will be migrated:
Enclosures 1
Virtual Connect interconnect modules 4
Servers 3
Ethernet networks 48
Fibre Channel networks 2
Server profiles 3
Enclosure group LAN_Enc01
Logical interconnect groups LIG__2
Total # of errors 0
Total # of warnings 2
Fibre Channel Fabrics
NGS1LAN
Warnings:
The OneView logical interconnect group "LIG__2" configuration does not match the Virtual Connect configuration. The following element(s) are inconsistent: Fibre Channel network "NGS1LAN" attribute(s) do not match: Typical Bandwidth,Maximum Bandwidth.
Resolution: Continuing with the Virtual Connect to OneView migration will use the existing OneView logical interconnect group configuration "LIG__2". If this OneView configuration is not acceptable, modify the specified OneView logical interconnect group "LIG__2" to be consistent with the Virtual Connect configuration. If no modifications are required, continue with the migration. If modifications were required, retest the compatibility.
NGS2LAN
Warnings:
The OneView logical interconnect group "LIG__2" configuration does not match the Virtual Connect configuration. The following element(s) are inconsistent: Fibre Channel network "NGS2LAN" attribute(s) do not match: Typical Bandwidth,Maximum Bandwidth.
Resolution: Continuing with the Virtual Connect to OneView migration will use the existing OneView logical interconnect group configuration "LIG__2". If this OneView configuration is not acceptable, modify the specified OneView logical interconnect group "LIG__2" to be consistent with the Virtual Connect configuration. If no modifications are required, continue with the migration. If modifications were required, retest the compatibility.
This is the error where the migrastion stopsd in oneview:
Create iusv1079
Server Profiles
11/8/17 4:54:06 pm
1 minute ago
Error1s
Validate configuration.
Issue Port Mezzanine (Mezz) 1:1 was not found for connection 6.
Resolution Select a different port and try again.
MEZZ 1 is not used for an Ethernet connection, it is used and configured for a fibre channel connection.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО11-20-2017 01:30 PM
тАО11-20-2017 01:30 PM
Re: Migration from VCM to Oneview 3.1
Can you provide the output from "show server {N}" in the OA (where {N} is the device bay number)? I want to see what adapters are installed. Can you provide a screenshot of your VCM Server Profile?
[Any personal opinions expressed are mine, and not official statements on behalf of Hewlett Packard Enterprise]

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО11-29-2017 05:13 AM - last edited on тАО11-30-2017 10:28 PM by Parvez_Admin
тАО11-29-2017 05:13 AM - last edited on тАО11-30-2017 10:28 PM by Parvez_Admin
Re: Migration from VCM to Oneview 3.1
Hello Chris,
sorry for the delay, here we go:
Server Blade #13 Information:
Type: Server Blade
Manufacturer: HP
Product Name: ProLiant BL460c Gen9
Part Number: 727021-B21
System Board Spare Part Number: 744409-001
Serial Number:
Serial Number (Logical): VCX0000001
UUID: 30373237-3132-5A43-3335-3230584B3853
UUID (Logical): 91561852-1D3F-4A78-97DF-F3A68786764F
Server Name:
Asset Tag:
ROM Version: I36 02/17/2017
Boot Mode: UEFI
Secure Boot: Disabled
CPU 1: Intel(R) Xeon(R) CPU E5-2680 v3 @ 2.50GHz (12 cores)
CPU 2: Intel(R) Xeon(R) CPU E5-2680 v3 @ 2.50GHz (12 cores)
Memory: 524288 MB
FLB Adapter 1: HP FlexFabric 20Gb 2-port 650FLB Adapter
Ethernet FlexNIC LOM1:1-a 00:17:A4:77:00:0C
Ethernet FlexNIC LOM1:1-b 00:17:A4:77:00:10
Ethernet FlexNIC LOM1:1-c 00:17:A4:77:00:14
Ethernet FlexNIC LOM1:2-a 00:17:A4:77:00:0E
Ethernet FlexNIC LOM1:2-b 00:17:A4:77:00:12
Ethernet FlexNIC LOM1:2-c 00:17:A4:77:00:16
Mezzanine 1: HP QMH2672 16Gb FC HBA for BladeSystem c-Class
Port 1: 50:01:43:80:02:a4:00:98
Port 2: 50:01:43:80:02:a4:00:9a
Management Processor Information:
Type: iLO4
Name: iusv1088-ilo
Firmware Version: 2.55 Aug 16 2017
IP Address: 172.23.104.80
MAC Address: 50:65:F3:64:EC:0E
Power Management Controller Version: 1.0.9
iLO Federation Capable: Yes
Profile is attached now.
Thank you and talk to oyu soon.
Best Regards
Eugen