GreenLake Administration
- Community Home
- >
- Storage
- >
- Entry Storage Systems
- >
- MSA Storage
- >
- Re: EVA6400/Blade presentation Error
MSA Storage
1846731
Members
4726
Online
110256
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Forums
Discussions
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
12-12-2009 12:21 PM
12-12-2009 12:21 PM
EVA6400/Blade presentation Error
Hi,
I'm integrating in an existing VMWare enviroment (4 DL385, 2 Cisco mds9124 fc switch, 1 msa2312fc) this solution:
1 C7000 with 4x BL465cG6 adn 2 Cisco MDS9124e
1 Eva 6400 with 2C2D
(See the attachedscheme)
The firmware of EVA and FCSwitch are the newest available.
The EVA6400 have 3 channel per-controller connected to the Cisco blade switch (9124e) and 1 loopback connector. The 4th ports of the Cisco blade switches (9124e) are connected to the existing Cisco FC Switch (9124) of the existing infrastructure.
The Command view server (DL360) is connected with 1 HBA (only 1) to one of the existing fc switch (9124).
We have two problems:
1.the command view see the controllers (A,B), but see the hosts only through controller-A path. We can present the LUN through HBA of blade hosts with port-1, but we cant through the port-2 (of all blade hosts).It's appaer how the B-controller is down (but it's up-and-runnig!). When we try to add host in Command view, the WWNs founded are only of port-1 (of all blade servers).
2.the existing hosts (DL385) connected to the existing switch (9124), are not founded by Command view (and cant be presented to EVA).
The zoning appear to be correct, the boot from SAN of blades work fine, but the problems still.
Can someone suggest something to me??
I'm integrating in an existing VMWare enviroment (4 DL385, 2 Cisco mds9124 fc switch, 1 msa2312fc) this solution:
1 C7000 with 4x BL465cG6 adn 2 Cisco MDS9124e
1 Eva 6400 with 2C2D
(See the attachedscheme)
The firmware of EVA and FCSwitch are the newest available.
The EVA6400 have 3 channel per-controller connected to the Cisco blade switch (9124e) and 1 loopback connector. The 4th ports of the Cisco blade switches (9124e) are connected to the existing Cisco FC Switch (9124) of the existing infrastructure.
The Command view server (DL360) is connected with 1 HBA (only 1) to one of the existing fc switch (9124).
We have two problems:
1.the command view see the controllers (A,B), but see the hosts only through controller-A path. We can present the LUN through HBA of blade hosts with port-1, but we cant through the port-2 (of all blade hosts).It's appaer how the B-controller is down (but it's up-and-runnig!). When we try to add host in Command view, the WWNs founded are only of port-1 (of all blade servers).
2.the existing hosts (DL385) connected to the existing switch (9124), are not founded by Command view (and cant be presented to EVA).
The zoning appear to be correct, the boot from SAN of blades work fine, but the problems still.
Can someone suggest something to me??
1 REPLY 1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
02-11-2010 06:15 PM
02-11-2010 06:15 PM
Re: EVA6400/Blade presentation Error
The Cisco switches use vsan's and zoning, so each port of the switch that you want to communicate needs to be in the same vsan. This vsan should also not be the default one, you should create one with a random number & ensure all ports are in that vsan.
The opinions expressed above are the personal opinions of the authors, not of Hewlett Packard Enterprise. By using this site, you accept the Terms of Use and Rules of Participation.