HPE GreenLake Administration
- Community Home
- >
- Servers and Operating Systems
- >
- HPE ProLiant
- >
- Server Management - Systems Insight Manager
- >
- Scheduled task runs on wrong server
Server Management - Systems Insight Manager
1833753
Members
2494
Online
110063
Solutions
Forums
Categories
Company
Local Language
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Forums
Discussions
Discussions
Discussions
Forums
Discussions
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
09-30-2004 07:56 AM
09-30-2004 07:56 AM
Scheduled task runs on wrong server
I'm a new Net Admin. finishing up a neglected install of Insight Manager. Things are coming along nicely.
I'm taking the "one server at a time" approach.
I have created a VCR and have my first server trusting it.
I'm deploying a Proliant Support Pack. I choose the server, supply the Windows login credentials. I can see that the trust is there. The support pack is downloaded. I schedule the task for a minute or two ahead (it's version 4.0).
The task runs but fails due to "Authentication Failed". The result information from the task shows that the "Tool ran on" a different server than I specified.
Am I misunderstanding what "Tool ran on" means?
I've checked IP numbers and my DNS looking for an issue there. Nothing.
What would cause this?
DWM
I'm taking the "one server at a time" approach.
I have created a VCR and have my first server trusting it.
I'm deploying a Proliant Support Pack. I choose the server, supply the Windows login credentials. I can see that the trust is there. The support pack is downloaded. I schedule the task for a minute or two ahead (it's version 4.0).
The task runs but fails due to "Authentication Failed". The result information from the task shows that the "Tool ran on" a different server than I specified.
Am I misunderstanding what "Tool ran on" means?
I've checked IP numbers and my DNS looking for an issue there. Nothing.
What would cause this?
DWM
3 REPLIES 3
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
09-30-2004 08:20 AM
09-30-2004 08:20 AM
Re: Scheduled task runs on wrong server
During the Initial Support Pack installation process the SIM CMS must login to itself using SSH to initiate a batch job that runs the Remote Deployment. The authentication failure error means that OpenSSH is not setup correctly on your CMS.
More information on the operation and troubleshooting of OpenSSH can be found in the latest version of the whitepaper "Secure Shell (SSH) in HP Systems Insight Manager" available at
http://www.hp.com/go/hpsim --> Information Library --> Whitepapers
More information on the operation and troubleshooting of OpenSSH can be found in the latest version of the whitepaper "Secure Shell (SSH) in HP Systems Insight Manager" available at
http://www.hp.com/go/hpsim --> Information Library --> Whitepapers
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
09-30-2004 08:29 AM
09-30-2004 08:29 AM
Re: Scheduled task runs on wrong server
Like I said, I'm figuring this out...getting there... I'm not familiar with what the "CMS" is yet as it relates to Insight Manager.
One of my frustrastions is the version numbers and functions/component names. Things seem to have various names as I move from document to document. Version numbers seem to be a jumble.
One of the servers on my network happens to be named "CMS". I assumed this task was somehow running on this server.
DWM
One of my frustrastions is the version numbers and functions/component names. Things seem to have various names as I move from document to document. Version numbers seem to be a jumble.
One of the servers on my network happens to be named "CMS". I assumed this task was somehow running on this server.
DWM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
09-30-2004 08:30 AM
09-30-2004 08:30 AM
Re: Scheduled task runs on wrong server
The SIM CMS is the Central Management Server ie the system that SIM is running on.