- Community Home
- >
- Servers and Operating Systems
- >
- HPE BladeSystem
- >
- BladeSystem - General
- >
- Re: Adding 2 new VC-Eth modules to existing produc...
BladeSystem - General
1753449
Members
6244
Online
108794
Solutions
Forums
Categories
Company
Local Language
юдл
back
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Discussions
Discussions
Forums
Forums
Discussions
юдл
back
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Blogs
Information
Community
Resources
Community Language
Language
Forums
Blogs
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-03-2009 02:35 AM
тАО02-03-2009 02:35 AM
Adding 2 new VC-Eth modules to existing production C7000 Enclosure
I need to add new 2 VC-Eth modules to existing C7000 enclosure with existing VC domain configured. Current config: Redundant OAs, VC-Eth modules in Bays 1,2, VC-FC modules in Bays 5,6. All latest FW levels.
New VC-Eth modules will be installed in Bays 3,4. What is the recommended procedure to avoid any outage to existing servers in enclosure?
My current plan is:
1. Backup VC domain configuration
2. Install VC-Eth module in Bay 3
3. Install VC-Eth module in Bay 4
4. Connect stacking cable between VC modules in Bay 1 and Bay 3
5. Connect stacking cable between VC modules in Bay 2 and Bay 4
6. Verify EBIPA addresses were assigned for new modules
7. Configure unique HP predefined MAC address ranges for new modules
8. Connect uplink cables to new VC modules and define new networks as necessary.
Is this the correct way? Existing production servers need to be fully operational during process. Thanks.
New VC-Eth modules will be installed in Bays 3,4. What is the recommended procedure to avoid any outage to existing servers in enclosure?
My current plan is:
1. Backup VC domain configuration
2. Install VC-Eth module in Bay 3
3. Install VC-Eth module in Bay 4
4. Connect stacking cable between VC modules in Bay 1 and Bay 3
5. Connect stacking cable between VC modules in Bay 2 and Bay 4
6. Verify EBIPA addresses were assigned for new modules
7. Configure unique HP predefined MAC address ranges for new modules
8. Connect uplink cables to new VC modules and define new networks as necessary.
Is this the correct way? Existing production servers need to be fully operational during process. Thanks.
2 REPLIES 2
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-03-2009 02:46 AM
тАО02-03-2009 02:46 AM
Re: Adding 2 new VC-Eth modules to existing production C7000 Enclosure
Do You have the extra NICs allready in place in the blades ?
Remember to give Kudos to answers! (click the KUDOS star)
You can find me from Twitter @JKytsi
You can find me from Twitter @JKytsi
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО02-03-2009 03:20 AM
тАО02-03-2009 03:20 AM
Re: Adding 2 new VC-Eth modules to existing production C7000 Enclosure
There no extra NICs installed in blades so far.