Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО12-16-2008 09:53 AM
тАО12-16-2008 09:53 AM
We have been using the VC Modules for awhile and they have been working great. What we are attempting now is to point several of the blades to use one of the Cisco switches, instead of the VC-Enet Modules. We still plan to use the VC-FC connestions for these Blades. I powered down those particular Blades, modified their VC profiles to only use the VC-FC, and powered them back up.
One of our Network Engineers configured the "virtual" ports on the Cisco Switch in Bay 7, which is connected to our WAN, for each those Blades (Ports 3, 4, & 5). In the Onboard Administrator, I have looked at the port mappings for that Cisco Switch and it shows no connections to any of the 16 Ports/Device Bays.
Did we miss a step somewhere or do we have to rip out the VC-Enet modules completely if we want to use the Cisco switches?
Thanks!
Chris
Solved! Go to Solution.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО12-16-2008 10:52 AM
тАО12-16-2008 10:52 AM
Re: Mixing VC-ENET and Cisco Catalyst Switched in same c7000
Are you familiar with the NIC port mapping on the c7000 enclosure?
For network connectivity with the integrated/embedded NIC controllers, the Ethernet connectivity must come out interconnect bays 1 & 2. If you have a Virtual Connect solution, the VC-Ethernets modules must be here.
If you want Cisco Catalyst 3020 switches to get the traffic from the integrated NICs, you must cable each VC-Enet module to the desired 3020 Interconnect switch.
Then in Virtual Connect, your Server Profile needs to include the VC-Enet modules.
You cannot change the port mapping of NICs (or FC HBAs) in the c7000 since this is hard-wired. So you will still have to go through the VC-Enet modules first.
Do you have Ethernet mezz cards in slot 2 or 3 in these blade servers?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО12-16-2008 11:48 AM
тАО12-16-2008 11:48 AM
Re: Mixing VC-ENET and Cisco Catalyst Switched in same c7000
"Note: If you want to use the VC-FC modules you have to keep the VC-Enet modules.
Are you familiar with the NIC port mapping on the c7000 enclosure?
For network connectivity with the integrated/embedded NIC controllers, the Ethernet connectivity must come out interconnect bays 1 & 2. If you have a Virtual Connect solution, the VC-Ethernets modules must be here.
If you want Cisco Catalyst 3020 switches to get the traffic from the integrated NICs, you must cable each VC-Enet module to the desired 3020 Interconnect switch.
Then in Virtual Connect, your Server Profile needs to include the VC-Enet modules.
You cannot change the port mapping of NICs (or FC HBAs) in the c7000 since this is hard-wired. So you will still have to go through the VC-Enet modules first.
Do you have Ethernet mezz cards in slot 2 or 3 in these blade servers?"
So I really cannot pull off what we want try short of adding the extra cables between the FC-Enet Modules and the Cisco Switch module or ripping out the FC-Enet Modules and putting the Cisco Switches into Bays 1 & 2. Then I will lose the VC-FC capability without the FC-Enet Modules in Bay 1 & 2, correct? I may do that anyway just for this POC.
Also the only Mezz cards in these Blades are the Q-Logic FC cards in Slot 1.
Thanks!
Chris
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
тАО12-16-2008 11:56 AM
тАО12-16-2008 11:56 AM
SolutionOtherwise the way you COULD use the 3020 switches in interconnect bay 7 & 8 is by adding a Ethernet mezz card in mezz slot 2 to each blade. This would allow Ethernet connectivity from the mezz 2 card (NIC ports 3 & 4 only) out to the 3020 switches. Or you add a mezz 3 Ethernet card and get ports 1 & 2 out the 3020 switches.
I think you have all the possible options now.