BladeSystem - General
1845945 Members
3601 Online
110250 Solutions
New Discussion

VirtualConnect Uplink Port Groups (Top Switch)

 
marcellinus
Occasional Contributor

VirtualConnect Uplink Port Groups (Top Switch)

Hello

We have a c700 with 2x VC F8 and 2x VC 10 deployed. I struggle a bit understanding correct wiring the interconnects and uplinks.

- Horizontal is done internally between F8s and 10s, thats fine.

- Vertical links I got slot 1 to slot 4 and slot 2 to slot 3 each two 10GB DAC.

- Uplink I have 40GB from slot 1 to Top-Switch and 40GB from slot 2 to Top-Switch.

I have two questions:

- should I add more vertical links, like slot 1 to 3 and slot 2 to 4?

- should I add uplink from slot 3 and slot 4 to Top-Switch?

Most important qustion:

- the uplinks go into individual ports or in one trunk LACP group at Top-Switch?

 

Thanks, kr.

 

1 REPLY 1
MV3
HPE Pro

Re: VirtualConnect Uplink Port Groups (Top Switch)

Hello,

 

Please refer to the below links. You should be able to get all the answers.

 

HP Virtual Connect traffic flow : https://www.hpe.com/psnow/doc/c03154250

HPE Virtual Connect for c-Class BladeSystem Setup and Installation Guide Version 4.85 : https://www.hpe.com/psnow/doc/a00102212en_us

 

Cheers...



I work at HPE
HPE Support Center offers support for your HPE services and products when and how you need it. Get started with HPE Support Center today.
[Any personal opinions expressed are mine, and not official statements on behalf of Hewlett Packard Enterprise]
Accept or Kudo